×

reservoir monitoring meaning in Chinese

油藏监测

Examples

  1. Time - lapse seismic has proved a effective tool for reservoir monitoring . but for its adaptability , it is rather necessary to study its feasibility before application . tune - lapse simulation is one of most important ways to study feasibility , and it also valuable in practice
    时移地震油藏监测技术已被证明是一种有效的开发地震技术,但该技术并不对所有的油藏都适用,因此时移地震的可行性研究十分必要。
  2. 4 - d seismic is a kind of reservoir monitoring technique which acquires and analyzes multiple seismic surveys repeated at the same site during the period of production in order to image the changes in a producing reservoir . it utilizes the knowledge of seismology , petrophysics and reservoir engineering comprehensively . there are some important methods such as the repeatability of seismic acquisition and processing , time lapse seismic interpretation and analyses
    四维地震是在油藏生产过程中,在同一地方,利用不同时间重复采集的、经过互均化处理的、具有可重复性的三维地震数据体,应用时间差分技术,综合岩石物理学和油藏工程等多学科资料,监测油藏变化,进行油藏管理的一种技术。

Related Words

  1. reservoir risk
  2. wettable reservoir
  3. reservoir barrels
  4. reservoir strata
  5. reservoir priming
  6. infinite reservoir
  7. vacuum reservoir
  8. zhelin reservoir
  9. chemical reservoir
  10. seasonal reservoir
  11. reservoir modeling
  12. reservoir modelling and geostatistics
  13. reservoir n
  14. reservoir nasal cannula
PC Version

Copyright © 2018 WordTech Co.